Pilkington Glass – Alfreton

Posted by Ross Render

 

 

Overview

  • Large Glass Manufacturing plant in Derbyshire
  • Over 900 existing luminaires on site
  • No Lighting Control
  • Excessive Maintenance Costs per annum
  • Poor Lighting Levels throughout site
  • Over 10% failure rate of all lighting on site

Objective

  • Offer a point for point Led Energy Saving Solution
  • Integrate Lighting control into existing Infrastructure
  • Reduce Maintenance costs on site
  • Increase Lighting Levels to Light Level guidelines
  • 5 Year Warranty on all Lighting with on-site Warranty

Results

  • Full point for point LED replacement with no infrastructure changes
  • Over 70 % Energy Saving across the site using Daylight Harvesting, Presence & Absence detection
  • Zero Maintenance for 5 Years
  • Increased Light Levels in all areas compared to existing Lighting lux level results
  • Safe workplace, No HS issues, fully maintained lighting system for 5 Years
  • Huge financial benefits over the life of the Led Lighting, ECA Compliant and Carbon Reduction

Color Skin

Header Style

Nav Mode

Layout

Wide
Boxed