- Large Glass Manufacturing plant in Derbyshire
- Over 900 existing luminaires on site
- No Lighting Control
- Excessive Maintenance Costs per annum
- Poor Lighting Levels throughout site
- Over 10% failure rate of all lighting on site
Objective
- Offer a point for point Led Energy Saving Solution
- Integrate Lighting control into existing Infrastructure
- Reduce Maintenance costs on site
- Increase Lighting Levels to Light Level guidelines
- 5 Year Warranty on all Lighting with on-site Warranty
Results
- Full point for point LED replacement with no infrastructure changes
- Over 70 % Energy Saving across the site using Daylight Harvesting, Presence & Absence detection
- Zero Maintenance for 5 Years
- Increased Light Levels in all areas compared to existing Lighting lux level results
- Safe workplace, No HS issues, fully maintained lighting system for 5 Years
- Huge financial benefits over the life of the Led Lighting, ECA Compliant and Carbon Reduction